top of page
Sinai Hospital
South Tower Expansion

Location:

Construction Manager:

Architect:

Structural Engineer:

Description:

Baltimore, Maryland

The Whiting-Turner Contracting Company

Hord Coplan Macht

Morabito Consultants

Addition of 3 floors above an existing hospital that remained in operation during construction, along with a 6-story link bridge to the adjacent hospital wing

conventionally reinforced & post-tension elevated slabs

4,400 cubic yards of concrete

bottom of page